Diffstat (limited to '')
-rw-r--r--doc/projectplan/ProjectPlan.tex64
-rw-r--r--references/Hardware/B200_RF_Performance.pdfbin0 -> 33808364 bytes
-rw-r--r--references/Hardware/Links.odtbin0 -> 8575 bytes
-rw-r--r--references/Hardware/b210.pdfbin0 -> 208548 bytes
-rw-r--r--references/Hardware/cu_ettus_b210_cca.pdfbin0 -> 662172 bytes
5 files changed, 35 insertions, 29 deletions
diff --git a/doc/projectplan/ProjectPlan.tex b/doc/projectplan/ProjectPlan.tex
index 4f01ff6..24227f1 100644
--- a/doc/projectplan/ProjectPlan.tex
+++ b/doc/projectplan/ProjectPlan.tex
@@ -61,23 +61,23 @@
\vspace{5mm}
{\LARGE Project: \textit{Fading illustration with SDR}} \\
\vspace{5mm}
- {\LARGE \bfseries Version 0.5}
+ {\LARGE \bfseries Version 1}
\end{flushright}
\end{titlepage}
-\section*{Changelog}
-\begin{tabularx}{\textwidth}{lrlX}
- \toprule
- \bfseries Date & \bfseries Version & \bfseries Author & \bfseries Description \\
- \midrule
- 2021-09-21 & 0.1 & Pross N. & Created document \\
- 2021-09-23 & 0.2 & Pross N., Halter S. & Created Project Plan \\
- 2021-09-23 & 0.3 & Halter S. & First Task description \\
- 2021-09-25 & 0.4 & Pross N. &
- Updated introduction, task description and described timeline \\
- 2021-09-27 & 0.5 & Halter S. & Updated development plan \\
- \bottomrule
-\end{tabularx}
+%\section*{Changelog}
+%\begin{tabularx}{\textwidth}{lrlX}
+% \toprule
+% \bfseries Date & \bfseries Version & \bfseries Author & \bfseries Description \\
+% \midrule
+% 2021-09-21 & 0.1 & Pross N. & Created document \\
+% 2021-09-23 & 0.2 & Pross N., Halter S. & Created Project Plan \\
+% 2021-09-23 & 0.3 & Halter S. & First Task description \\
+% 2021-09-25 & 0.4 & Pross N. &
+% Updated introduction, task description and described timeline \\
+% 2021-09-27 & 0.5 & Halter S. & Updated development plan \\
+% \bottomrule
+%\end{tabularx}
\vfill
{
@@ -226,6 +226,9 @@ At the end comes the same with a movable Reviser. Walking will be used to demons
Working fading TX -- RX & Week 49 &
Both the simulated and the physical transmission lines work and it is possible to observe the consequences of fading.\\
+
+ Abstract & 17 Dec. 2021 &
+ The abstract is handed in. \\
Documentation & Week 50 &
The documentation is complete both on the theory and practical sides. \\
@@ -264,6 +267,9 @@ At the end comes the same with a movable Reviser. Walking will be used to demons
bar height = .4,
milestone top shift = .2,
milestone height = .3,
+ % clored elements
+ bar/.append style={fill=gray},bar incomplete/.append style={fill=white},
+ progress label text=\relax,
% modify stile of elements
bar/.append style = {
thick,
@@ -287,24 +293,24 @@ At the end comes the same with a movable Reviser. Walking will be used to demons
\ganttgroup{Research}{2021-09-21}{2021-11-28}
\ganttnewline
- \ganttbar{Theory}{2021-09-22}{2021-11-28}
+ \ganttbar[progress=20]{Theory}{2021-09-22}{2021-11-28}
\ganttnewline
- \ganttbar{Software Toolboxes}{2021-09-27}{2021-10-31}
+ \ganttbar [progress=25]{Software Toolboxes}{2021-09-27}{2021-10-31}
\ganttnewline
- \ganttbar{Hardware}{2021-10-04}{2021-10-31}
+ \ganttbar[progress=6]{Hardware}{2021-10-04}{2021-10-31}
\ganttnewline
\ganttgroup{Prototype}{2021-10-04}{2021-10-31}
\ganttgroup{Demonstration}{2021-11-03}{2021-12-05}
\ganttnewline
- \ganttbar{Simulation}{2021-10-04}{2021-10-18}
- \ganttbar{Hardware}{2021-10-18}{2021-10-31}
+ \ganttbar[progress=0]{Simulation}{2021-10-04}{2021-10-18}
+ \ganttbar[progress=0]{Hardware}{2021-10-18}{2021-10-31}
\ganttmilestone{Working SDR TX -- RX}{2021-11-01}
- \ganttbar{Fading model}{2021-11-03}{2021-11-19}
- \ganttbar{Measurements}{2021-11-20}{2021-12-05}
+ \ganttbar[progress=0]{Fading model}{2021-11-03}{2021-11-19}
+ \ganttbar[progress=0]{Measurements}{2021-11-20}{2021-12-05}
\ganttmilestone{Working fading TX -- RX}{2021-12-06}
\ganttnewline
@@ -313,21 +319,21 @@ At the end comes the same with a movable Reviser. Walking will be used to demons
\ganttbar{Project Plan}{2021-09-21}{2021-10-04}
\ganttmilestone{Submission}{2021-10-05}
- \ganttbar{Elevator Pitch Video}{2021-11-08}{2021-11-28}
- \ganttbar{Abstract}{2021-12-02}{2021-12-09}
+ \ganttbar[progress=0]{Elevator Pitch Video}{2021-11-08}{2021-11-28}
+ \ganttbar[progress=0]{Abstract}{2021-12-02}{2021-12-09}
\ganttmilestone{Abstract Draft}{2021-12-10}
\ganttnewline
- \ganttbar{Introduction and Task Desc.}{2021-09-27}{2021-10-24}
- \ganttbar{Methods (SW and HW)}{2021-10-27}{2021-11-16}
- \ganttbar{Results}{2021-11-20}{2021-12-11}
+ \ganttbar[progress=0]{Introduction and Task Desc.}{2021-09-27}{2021-10-24}
+ \ganttbar[progress=0]{Methods (SW and HW)}{2021-10-27}{2021-11-16}
+ \ganttbar[progress=0]{Results}{2021-11-20}{2021-12-11}
\ganttmilestone{Ready}{2021-12-12}
- \ganttbar{Review}{2021-12-14}{2021-12-22}
+ \ganttbar[progress=0]{Review}{2021-12-14}{2021-12-22}
\ganttmilestone{Submission}{2021-12-23}
\ganttnewline
- \ganttbar{Theory}{2021-10-07}{2021-12-04}
- \ganttbar{Slides}{2021-12-06}{2021-12-22}
+ \ganttbar[progress=0]{Theory}{2021-10-07}{2021-12-04}
+ \ganttbar[progress=0]{Slides}{2021-12-06}{2021-12-22}
\ganttmilestone{Presentation}{2021-12-23}
\ganttnewline
\end{ganttchart}
diff --git a/references/Hardware/B200_RF_Performance.pdf b/references/Hardware/B200_RF_Performance.pdf
new file mode 100644
index 0000000..6d87cac
--- /dev/null
+++ b/references/Hardware/B200_RF_Performance.pdf
Binary files differ
diff --git a/references/Hardware/Links.odt b/references/Hardware/Links.odt
new file mode 100644
index 0000000..e0a429e
--- /dev/null
+++ b/references/Hardware/Links.odt
Binary files differ
diff --git a/references/Hardware/b210.pdf b/references/Hardware/b210.pdf
new file mode 100644
index 0000000..9951633
--- /dev/null
+++ b/references/Hardware/b210.pdf
Binary files differ
diff --git a/references/Hardware/cu_ettus_b210_cca.pdf b/references/Hardware/cu_ettus_b210_cca.pdf
new file mode 100644
index 0000000..2dc7234
--- /dev/null
+++ b/references/Hardware/cu_ettus_b210_cca.pdf
Binary files differ